St Marks Church change-of-use proposals
Sphion developed the reuse of a former Jarrow church as a residential family assessment centre with manager accommodation and a ground-floor gym.
Jarrow, Tyne and Wear • 2025 • Planning permission granted with 20 conditions — March 2026
Giving the former church a new use
The design combined a six-bedroom residential family assessment centre with manager accommodation and a ground-floor gym. New internal floors, independent access, a lift, stairs, fire escape and revised openings were coordinated within the former church.
The proposed residential arrangement includes shared wet and shower rooms, kitchen and laundry facilities, communal living, soft-play and sensory space, staff accommodation and an office. The reviewed plans record 249 square metres for the ground-floor gym and 264 square metres for the proposed first floor; these are drawing values rather than measurements of completed works.
Design development and council review
South Tyneside Council granted ST/0037/24/FUL on 13 March 2026, subject to 20 conditions. The building is a locally listed, non-designated heritage asset. The officer weighed some heritage harm from new openings and stonework against the benefits of reuse and the proposed service.
Revisions removed a proposed driveway and vehicle access, retained the boundary enclosure, adjusted windows and stonework and added cycle parking. A 1.8-metre obscure screen to the fire escape addressed overlooking. Noise separation between the gym and residential accommodation was a central technical consideration.
Historic Environment, Environmental Health, Highways, trees and ecology consultees informed the revisions and conditions. The officer recorded no public representations following repeat publicity.
Approved drawings and supporting information
The council register contains 66 documents, including successive floor plans, roof plans, elevations and site drawings, heritage information, arboricultural reports, ecology and bat surveys, noise assessment and operating information. The final decision identifies ten drawings received on 2 July 2025.
The final decision, officer assessment and two current floor plans were reviewed for this case study. The linked council register provides the wider drawing and consultation record; not every individual document has been independently assessed.
Key conditions before use
Permission restricts the residential use to a family assessment centre and the ground floor to a gym. It is not evidence of operational registration or approval by a care regulator. The council describes voluntary family assessments rather than custodial detention.
- Acoustic floor construction, post-installation testing and any required mitigation before residential occupation; specified glazing and ventilation must be retained.
- Further approval of window and stonework details, with tree protection, ecological precautions, biodiversity enhancements and landscaping requirements.
- Lift installation, covered secure cycle parking and the screened fire escape before residential use, alongside separate gym cycle-storage requirements.
- Gym operating hours of 06:00–20:00 daily, controlled construction hours and refuse-storage arrangements.
- Compliance with approved plans, a three-year commencement limit and the remaining requirements in the full 20-condition notice.
Outcome and official records
Planning permission is verified. Condition discharge, commencement, construction completion and operational registration have not been independently verified.
Planning your project
Explore our planning guides and discuss the drawings, approvals and technical information your project may need.
Planning guides · Planning insights · Discuss a project · All portfolio projects
Planning permission granted with 20 conditions — March 2026
Planning drawings; Proposed plans and elevations